Application for Temporary Construction Hydrant Meter Permit

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

Fees:

  • Deposit for hydrant meter with backflow prevention assembly: $3,000.00
  • Application Fee: $122.00
  • On a monthly basis the following:
    • Equipment Rental Charge: $233.57
    • Backflow Assembly Test Fee: $5.00
    • The current metered nonresidential usage rate per hundred cubic feet.

Unauthorized use of Fire Hydrant(s) is subject to a $1000.00 charge as stated in Regulation 3, Section P(3).

* is required information

Please correct the fields below:

Contact Information:

 *
Contact Information:

Project Location:

 *
Project Location:
Location of Fire Hydrant:
Location of Fire Hydrant:
Proposed Use of Water:
Specific Measures to be Taken to Minimize Water Use:
  • Such as: utilizing sweeper for clean up of hard surfaces, importing fill that requires less water to achieve the required compaction, using Class 2 aggregate base, etc.

I have read the terms, conditions and notices concerning the District’s provision of water service and agree to abide by them, as well as by all applicable rules, regulation and ordinances governing District water service not specifically referred to above.