Sacramento Suburban Water District
Home MenuNaomi Main Replacement
The project consists of the installation of new water distribution main pipeline in public streets to replace existing backyard water mains that have outlived their useful life.
Major project facts:
- 3,400 feet of 8-, and 12-inch diameter pipe is to be installed
- 13 fire hydrants will be upgraded
- 11 new metered services will be installed; and 15 meters will be reconnected
- The construction cost is estimated to be $1.1 million
Schedule:
- The project began in November 2019 and is expected to be completed in the spring of 2020.
- Final street restoration is anticipated in the spring of 2020 (warmer temperatures are necessary for this type of work).
- April Work Phases (see map below):
- Main Replacement - Phase 1& 2 (Doug Veerkamp General Engineering, Inc.)
- Service Line and Meter Installation - Phase 1 & 2 (Flowline Contractors, Inc.)
Download the pdf version of the project area map
Billing:
- Flat rate billing will remain in effect until November 2021 when it will convert to meter rate billing.
- Shortly after your meter is installed, your water bill will include new informational items:
- A consumption graph showing monthly usage.
- Meter rate billing amount.
- You may opt to start meter rate billing early. If so, please contact the Customer Service Department at 916.972.7171 or email feedback@sswd.org.
Contact Information:
After-hours emergency calls should be directed to SSWD's main number 916.972.7171.
Construction Manager (primary contact)
ERC Contracting (contractor for SSWD)
Ricky (Richard) Ingraham
Phone: 916.768.0786
Email: erccontracting@yahoo.com
Field Inspector
S. E. Ahlstrom Inspection (contractor for SSWD)
Scott Ahlstrom
Phone: 916.849.7159
Email: seahlstrom@yahoo.com
Project Manager
Sacramento Suburban Water District
Mitchell McCarthy, Assistant Engineer
Phone: 916.679.2896
Email: mmccarthy@sswd.org